Sailing the Rangatira
Saturday, October 11, 2014
Halyard upgrades are done
Last Halyard installed
three clutches at cabin top winch with fairleads
temporary placement of organizer
mast exit box just fits the line
Thursday, October 2, 2014
new mainsail and new halyards for fore and spin installed just need to replace sheave in mast exit box
to install the main halyard for cockpit control
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Popular Posts
(no title)
What the bottom was like Rangatira is 1974 Discovery 32-2 Made by Erwin Yachts Design by Peter Hatfield LOA 3...
My RVG Wind Vane Self steering gear
A while ago I got an wind vane just needed to find a vane for it RVG Wind Vane New links and updated info RVG Wind vane Brochure
(no title)
april 14 sail good day
Rangatira gets a new heart
Just a quick update have new inboard lined up
Engine with exhaust and heat exchanger mounted
(no title)
Our life with the Rangatira began In April of 2011 We purchased her in Secret Cove, a few miles north of Sechelt, BC, on the Sunshine Co...
Second night on the trip home
Approach to Montague Harbour south end of Galiano Island Next morning at Montague
(no title)
Had a 10' piece of 3/16 amsteel so what to do ... Soft shackles Two short shackles with Diamond knot and one long heavy duty with but...
(no title)
Our sailing 2014 so far Winter Cove Saturna Island Boat Pass Boat Pass Winter Cove Saturna Island Clam Bay between ...
(no title)
New sailing season is upon us Trips: planning to hit desolation sound this summer will be doing 3 weeks starting June 01 ...