Friday, October 30, 2015
Friday, March 13, 2015
Wednesday, March 4, 2015
Saturday, February 21, 2015
Wednesday, February 4, 2015
Degreasing engine
Rust neutralizing
Primed with Zinc chromate 3 coats
painting engine 3 coats
water pumps rebuilt
new belts
alternater tested
trying ceramic paint for exhaust
need to bake at 500° F
need to get part for mixer elbow made
and change oil in crancase and gearbox
but after that engine is all good to go in
Rust neutralizing
Primed with Zinc chromate 3 coats
painting engine 3 coats
water pumps rebuilt
new belts
alternater tested
trying ceramic paint for exhaust
need to bake at 500° F
need to get part for mixer elbow made
and change oil in crancase and gearbox
but after that engine is all good to go in
Subscribe to:
Posts (Atom)
Popular Posts
-
What the bottom was like Rangatira is 1974 Discovery 32-2 Made by Erwin Yachts Design by Peter Hatfield LOA 3...
-
A while ago I got an wind vane just needed to find a vane for it RVG Wind Vane New links and updated info RVG Wind vane Brochure
-
april 14 sail good day
-
Our life with the Rangatira began In April of 2011 We purchased her in Secret Cove, a few miles north of Sechelt, BC, on the Sunshine Co...
-
Approach to Montague Harbour south end of Galiano Island Next morning at Montague
-
Had a 10' piece of 3/16 amsteel so what to do ... Soft shackles Two short shackles with Diamond knot and one long heavy duty with but...
-
Our sailing 2014 so far Winter Cove Saturna Island Boat Pass Boat Pass Winter Cove Saturna Island Clam Bay between ...
-
New sailing season is upon us Trips: planning to hit desolation sound this summer will be doing 3 weeks starting June 01 ...