Wednesday, February 4, 2015

Degreasing engine
Rust neutralizing
Primed with Zinc chromate 3 coats
painting engine 3 coats
water pumps rebuilt
new belts
alternater tested
trying ceramic paint for exhaust
need to bake at 500° F
need to get part for mixer elbow made
and change oil in crancase and gearbox
but after that engine is all good to go in


Friday, November 28, 2014

Saturday, October 11, 2014

Halyard upgrades are done

Last Halyard installed

 three clutches at cabin top winch with fairleads
 temporary placement of organizer
mast exit box just fits the line

Thursday, October 2, 2014

new mainsail and new halyards for fore and spin installed just need to replace sheave in mast exit box
to install the main halyard for cockpit control

Popular Posts